Praćenje pogona i održavanja opreme u nuklearnoj elektrani

ENCONET pruža stručnu pomoć u razvoju programa za praćenje pogona i održavanja opreme u nuklearnoj elektrani, a obuhvaća sve aktivnosti potrebne od nastanka potrebe za opremom preko njezine nabave, instalacije, utjecaja na postojeću opremu, probnog rada, pogona, testiranja, zabilježenih odstupanja, preinaka, kvarova, tijek i plan održavanja do njezine zamjene.

 

Reference

Projekti u NE Krško

  • Program praćenja elektromotorno upravljanih ventilia (MOV – Motor Operated Valves Program);
  • Program praćenja pneumatski upravljanih ventilia (AOV – Air Operated Valves Program);
  • Kvalifikacija elektroopreme (EQ – Environmental Qualification);
  • Praćenje i upravljanje starenja kabela (Cable Aging Management Program)
  • Upravljanje dokumentacijom – praćenje promjena konfiguracije postrojenja, praćenje radnih naloga, modifikacija, zamjena opreme, obilazaka postrojenja, ažuriranje dokumentacije i stanja komponenata kroz održavanje baze podataka (MECL – Master Equipment Component List);
  • Kontrola dokumenta (DCM – Document Control Module)
  • Rješavanje otvorenih inženjerskih pitanja (Program korektivnih akcija)
  • Priprema modifikacijskih paketa
  • Opis sustava, sistema i komponenti

 

Radni procesi

  • Osiguranje i kontrola kvalitete
  • Upravljanje dokumentacijom

Izvještaji

  • Identification, Evaluation and Corrective Action Proposal for the Valves from NEK MOV Program Susceptible to the Pressure Locking (PL) Phenomena, WR-NEK-138/09-DIR3-R4, Zagreb, March 2010.
  • Identification, Evaluation and Corrective Action Proposal for the Valves from NEK MOV Program Susceptible to the Thermal Binding (TB) Phenomena, WR-NEK-138/09-DIR4-R1, Zagreb, March 2010.
  • Use of NEK MOV Database, NPP Krško, 2008.
  • NEK MOV Database User Manual, NPP Krško, 2008.
  • Determination of MOV Test Setup Window and Post-test Evaluation Method, NPP Krško, 2008.
  • NEK MOV Report Outage 2007., NPP Krško, 2008.
  • Preparing and Performing Design Basis DP Test on Valves CC-10302 and CC-10305, NPP Krško, 2008.
  • Preparing and Performing Design Basis DP Test on Valve CS-8135, NPP Krško, 2008.
  • Preparing and Performing Design Basis DP Test on Valve SI-8801A, NPP Krško, 2008.
  • “Resolution of CAP 2003 7550”, NPP Krško, 2008.
  • SOV Selection Criteria, NPP Krško, 2008.
  • AOV Program Baseline Testing Methodology, NPP Krško, 2008.
  • Baseline Testing Procedures, NPP Krško, 2008.
  • Set-point Control, NPP Krško, 2008.
  • Design Basis Review of Critical Parameters for Selected Valves, NPP Krško, 2008.
  • “Pneumatski upravljani ventili – Radni priručnik za potrebe NEK AOV programa”, AOV-PR-01-2006, December 2006, Zagreb
  • “Design Basis Review of Critical Parameters for Selected Diaphragm, Ball, Butterfly, Gate and Globe Valves“, AOV-DNU-791-WR-01-2006, December 2006, Zagreb
  • “Resolution of CAP 2005-2210 (Review of relief valves according to the requirements from the NSD-TB-93-06-R0, Summary report“, STR-DNU-859-WR-07-2006, December 2006, Zagreb
  • “Small Task Request NEK-06-06 Evaluation of CS,BD,MS,AF System Valves According to the Requirements from the NSD-TB-93-06-R0 (Response to CAP 2005-2210“ STR-DNU-859-WR-06-2006, December 2006, Zagreb
  • “Small Task Request NEK-06-05 Evaluation of the SI, FW, CI, RC System Valves According to the Requirements from the NSD-TB-93-06-R0 (Response to CAP 2005-2210“,STR-DNU-859-WR-05-06, December 2006, Zagreb
  • “Small Task Request NEK-06-04 Evaluation of the Selected CC System Valves According to the Requirements from the NSD-TB-93-06-R0 (Response to CAP 2005-2210 “, STR-DNU-859-WR-04-2006, December 2006, Zagreb
  • “Scoping and Categorization Methodology fot NEK Check Valve Program MR-WR-03-2006“, November 2006, Zagreb
  • “Update of NEK Tank Volume Calculations and Tank-Book Database to rev.1.0, MR-WR-02-2006“, November 2006, Zagreb
  • “IB-005 Ambient Temperature Component Limitation Review“, November 2006, Zagreb
  • “Small Task Request NEK-02-006 Evaluation of the NEK Response to Limitorque Declutch System Anomaly (Response to CAP 2005-1650-NSAL 93-002“, STR-DNU-859-WR-02-2006, August 2006, Zagreb
  • “Small Task Request NEK-01-006 Evaluation of the Selected CC System Valves According to the Requirements from the NSD-TB-93-06-R0 (Response to CAP 2005-2210”, STR-DNU-859-WR-01-2006, July 2006, Zagreb
  • “Design Basis Review of Selected Valves and Evaluation of Critical Parameters”, AOV-DNU-WR-01-2006, June 2006, Zagreb
  • “Ambient Temperature Component Limitation Review of Room IB-005”, MR-WR-01-2006, May 2006, Zagreb
  • “Small Task Request NEK-05-003 Methodology for the Resolution of the NSD-TB-93-06-R0”, STR-DNU-765-WR-06-2005, December 2005, Zagreb
  • “Small Task Request NEK-05-006 Acquisition of Relief Valves Set Pressure”,, STR-DNU-765-WR-05-2005, December 2005, Zagreb.
  • “Small Task Request NEK-05-005 Acquisition of Relief Valves Set Pressure”, STR-DNU-765-WR-04-2005, December 2005, Zagreb.
  • “Small Task Request NEK-05-004 Acquisition of Relief Valves Set Pressure”, STR-DNU-765-WR-03-2005, December 2005, Zagreb.
  • “Review of Quality Assurance Related Items from PSR and OSART Action Plan”, QA-DNU-763-WR-02-2005, Rev.0, Zagreb, December 2005, Zagreb
  • “Small Task Request NEK-05-001 Simulation of AF Flow Control Valve Instrument Loop”, STR-DNU-765-WR-02-2005, December 2005, Zagreb.
  • “Small Task Request NEK-05-002 Acquisition of Relief Valves Set Pressure”, STR-DNU-765-WR-01-2005, December 2005, Zagreb
  • “Quality Assurance Related Items in NEK Regulatory Compliance Program (NEK RCP”, QA-DNU-763-WR-01-2005, Rev.0, Zagreb, August 2005
  • Working Material “Revision of Emergency Class Determination Procedure According to NEI 99-01 (Technical Basis”, ER-DNU-765-2005, Rev.0, Zagreb, June 2005
  • Independent Evaluation of PSR-NEK-4.2, rev.0, version 4, Chapters 3.2-3.5 – Justification for potential changes of NEK QA Plan, Revision 5”, QA-POG-3219-WR-01-2004, Rev.0, May 2004
  • “Independent Evaluation of PSR-NEK-4.2, rev.0, version 4, Chapters 3.2-3.5 – Justification for potential changes of NEK QA Plan, Revision 5”, QA-POG-3219-WR-01-2004, Rev.0, May 2004
  • “Independent Evaluation of PSR-NEK-4.2, rev.0, version 4, Chapter 3.6 – Justification for potential changes of NEK QA Plan, Revision 5”, QA-POG-3219-WR-02-2004, Rev.0, May 2004
  • “QA IntraNEK Home Site, Rev. 2.0”, QA-WR-01-2004, Rev.0, February 2004
  • “Proposal for revision of Appendix G of the NEK QA Plan, rev. 5”, QA-POG-3219-WR-03-2004, Rev.0, July 2004
  • Processes Quality Assurance Activities – Independent Evaluation of PSR-NEK-4.2, rev.0, version 4, Chapter 3.1 – Justification for Draft NEK QA Plan, Rev.5 Revision
  • Priročnik in matrika potrebnih znanj kadrov ING.NOV NE KRŠKO, TM-DP-02-2003
  • Priročnik in matrika potrebnih znanj kadrov ING.PI NE KRŠKO, TM-DP-01-2003
  • Priročnik in matrika potrebnih znanj kadrov ING.GOR NE KRŠKO, TM-DP-01-2002
  • Priročnik in matrika potrebnih znanj kadrov ING.POD NE KRŠKO, TM-DP-01-2001
  • QA IntraNEK Home Site rev. 1.0 (Contract No. 3065″, Rev.0, QA-WR-01-2002
  • AOV Database – revision 1.2 (contract No. 3070”, AOV-WR-02-2002
  • Draft Work Procedure “System Design Basis Review and Design Condition”, AOV-WR-01-2002
  • Work Procedure ”Verification of AOV Database Input Data”, WP-AOV-01-2001
  • ESP-2.xxx AOV Scope and Categorization, procedure in NEK format
  • Expert Report – Risk Ranking of NEK AOV’s Based on PSA Methodology”, AOV-ER-01-2001
  • Verification of AOV Database Input Data, AOV-WR-05-2001
  • AOV Database, AOV-WR-04-2001
  • Complete Initial NEK AOV List, AOV-WR-03-2001
  • Final AOV Categorization, AOV-WR-02-2001
  • Basic NEK AOV Scope, AOV-WR-01-2001
  • Definition of Initial AOV Scope”, AOV-WR-01-2000
  • NEK AOV Program Scope criteria development and procedure preparation
  • NEK AOV Program (initial activities
  • Development of NE Krško startup and testing plan following the Steam generator replacement as part of Framatome team
  • NE Krško high pressure turbine efficiency change after replacement of HP turbine seals
  • NE Krško (NPP Krško spare parts identification and consolidation
  • MECL Database Consolidation Engineering Services Support
  • Preventive Maintenance Program Procedure (NEK MOV Program Development
  • Pressure Locking and Thermal Binding Screening and Evaluation for NEK MOV
  • Expertise of MOV On-Line Testing and Analysis of Test Results
  • Expertise of MOV Testing during Outage’03 and Analysis of Test Results
  • Expertise of MOV Testing during Outage’02 and Analysis of Test Results
  • Expertise of MOV Testing during Outage’01 and Analysis of Test Results
  • Expertise of MOV Testing during Outage’00 and Analysis of Test Results
  • Expertise of MOV Testing during Outage’99 and Analysis of Test Results
  • Weak Link Analysis (for Westinghouse Gate Valves
  • NEK MOV Program – Testing Activities Engineering Support (scheduling, pretest analysis, ETT and TTC installation, testing, data acquisition, fast test result analysis
  • Independent verification of all electrical inputs and calculated data for MOVs included in NEK MOV Program
  • NEK MOV Database Redesign and Revision based on CRANE-MOVATS methodology (including engineering calculation and engineering evaluation built-in
  • NEK MOV Database Development based on VECTRA methodology (including engineering calculation and engineering evaluation built-in